Case Studies

Case Studies

Projects;

Removal of asbestos underclocking cement product and reinstatement with non-asbestos equivalent, Also the front and back of the unit has been replaced.

Before After

Removal and disposal of 700m² of the asbestos roof tiles to grade 2 listed Building

Before After

Wrap and cut removal of asbestos lagged pipework within boiler room.

Environmental Clean, strip out and asbestos roof removal after the fire damage

Before After